4.1 Drawings Vol 2- Section 8 Part D Architectural & Structural, 4.2 Bill of Quantities Bills 8,12,13,14,15,16. Walls shall be built in stretcher bond unless otherwise specified. Method Statement of Polyurethane Waterproofing for Walls and Roof, Bituminous Damp Proofing for Concrete and Masonry | SWMS, Method Statement for Cutting and Patching Works, Method Statement for Cast in Place Concrete Works, Method Statement for Trench Excavation and Backfill for Electrical Cables, Method Statement for Concrete Blockwork | CMU Block Work, Method Statement for Installation of Ceramic Tiles, Method Statement for Plastering Work | Portland Cement Plaster, Method Statement for Marble Flooring and Marble Wall Cladding, Method Statement for Gypsum Board Ceiling, Wall Partitioning & Cladding, Method Statement for Electrical Wires and Power Cables Installation, Method Statement for Earthing and Lightning Protection System, Method Statement for Installation of Cable Tray or Trunking, Method Statement for Interior and Exterior Lighting System Installation, Method Statement for Installation of Electrical Conduit and Boxes, Inspection and Testing Procedure of Drainage Piping after Installation, Method Statement for Installation of Drainage Piping System, Method Statement for Welding Works | Welding Techniques, Method Statement for Installation of Water Pumps, Method Statement for Concrete Blockwork, Construction Method of Concrete Blockwork, Concrete Block Construction, Concrete Block Wall, Masonry Concrete Work, Masonry Work in Construction, In this Article today we will talk about the Method Statement for Concrete Blockwork | Construction Method of Concrete Blockwork | Concrete Block Construction | Concrete Block Wall | Masonry Concrete Work | Masonry Work in Construction | Work Method Statement for Construction Works| Work Method Statement Template | Method Statement for Block Masonry Work. Copyright 2022 QA QC in Construction Blog. All personnel shall attend safety induction/training prior to start any job at site. Approved method statement for blocks works Approved shop drawings for architect drawings Procedure 9.1 For double cavity wall: 9.1.1 Cleaning very well for the working area. Cutting and fitting for chases, pipes, conduits, sleeves, shall be coordinated with other sections of work to provide correct size, shape and location. 4.1.5 WALL TIES: Wall ties shall be Stainless steel/galvanized steel vertical twist type complying with BS 1243 table 3. Unless otherwise specified in writing, all materials must be obtained from a single source. Block work shall rise at the rate of four courses per 900mm. Request to release the amount deducted from the certified invoices, Requirement of single piece gypsum tile panel as per our required size, Serious concerned over failure of fixing doors at 14th floor, Structural Guarantee of the beam jacketing, Submission of current invoice and to claim ofmaterial delivery, Submission of Extended Advance Bank Guarantee, Submission of kitchen first floor drawing, Submission of the proposal to close the distribution pump opening in PT slab, To fix the floor tile in first floor corridor outside of All Day Dining, To provide Headboard screw position with detail and required sample, To provide MEP requirement drawings for execution in Stag bar and All Day Dinning, Undertaking letter by Main contractor for structural safety /building safety, Your ref. 14 Types of Best Construction Equipment and Their Uses, Before commencing the block work, the area shall be cleared of all debris, loose materialsor other obstructions. Follow LOTO procedure strictly when needed when required. Hand mixing (if permitted) may be done on a watertight platform. All rights reserved. I, Section 4, 3.3 British Standards BS 6073, BS 4027, BS 12, Bs 1200 table 1, BS 4887, BS 1243 Table-3, BS 743 type-C, BS 3416-type 1, Class A. A- Mock up of typical block masonry shall be constructed for each type of external and internal location to demonstrate How to fix Accessories & Quality of Material and Execution of work and written approval (through ITR procedure) shall be obtained prior to proceeding with further actual works at site. Powered by WordPress Ensure tools undergone inspection by a competent person and record must keep. Handling and Storage of Concrete Blocks: Method Statement for Suspended Ceiling Installation, Project Drawings Issued for Construction (IFC). All joints shall be solidly filled and the thickness of the joints shall not exceed 10mm. Request to pay directly to the supplier for long lead item or major procurement items. Tool box talks will be conducted every prior to start the work. Copyright 2022 Provisions of adequate cool drinking water, shade, and salt tablets will be in place. Mortar and grout shall be used as specified in project specifications. 1.1 Is to define the requirements for supply and laying of concrete block work for the buildings and utilities under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project Buildings and utilities and support service Phase 1-Utilities. Reply response of Interim Extension of Time Claim (EOT-01), Balance work at 14 th floor and three nos of door not fixed, Change instruction by client from 2-gang to 3-gang switch, CHECKLIST FOR TESTING & COMMISSIONING OF FIRE PUMPS SET, Confirmation on non-requirement of Mobilization NOC from DDA. All work shall be laid to line, in level courses and all individual face units shall be kept in plane. The average compressive strength of 10 sample blocks shall be of. During CMU laying an open joint not more than 13mm shall be left between all concrete lintels and the blocks adjacent to those ends. Only competent/authorized person shall be assigned for the task. Endorsement of LOI and work order by main contractor, Engineers are ready for training required for xxx Contracting L.L.C License no: xxx. The Project Health and Safety Plan (Approved HSE Plan). 2.1 Concrete block work for buildings and utilities in Service Base Area, Service Berth and F.S.O Marine area and Telecom building. Build block work within permissible deviations as specified. Confirmation to toilet door frame width for single shutter non sliding door area. Regarding your measurement sheet & discrepancy and our concern. 9.1.5 Place cement sand mix along the thread and start erect the hollow blocks 150mm thickness, alignment and vertically to be controlled by using 3m length aluminum tube and separate level. 2-Scope: For internal and external block walls of the Hospital under the scope of the contract. Block work to be stopped at fifth course with maximum height 1m per day. DPC shall be asbestos based bitumen to comply with BS 743 type 3 or plastic type to the approval of the QPengineer. Save my name, email, and website in this browser for the next time I comment. Try to keep horizontal joints of uniform thickness. Handing over the site and work parallelly with main contractor. Delay penalty due to failure to fulfil contractual obligations. The ME will ensure that the materials being used are in accordance to the Project Specifications, the approved Material Submittals. 1st course of CMU survey release in compliance with approved shop drawings shall be secured. Dismantle the scaffold dont demolish it and applied Red tag during dismantlingAll dismantling work carried out under strict supervision of Scaffold & job supervisor. 4 Procedure: 4.1 Submittals 4.1.1 Aker will submit AAC blocks supplier and sample for the consultant's approval. 9.2.1 Cleaning very well for the working area. Concrete Block Masonry Purpose & Scope: The purpose of this method statement is to define the work procedure for block works. Check the work before submit the request to company for review /approval. Area shall be clean prior to starting work. Blockwork Wall Construction Details. Avoiding unnecessary heavy manual handling of materials use mechanical equipment. CMU surface shall be wetted to prevent rapid drying out of mortar. 9.1.6 Angle wall tie to be erected every alternative course at the connection between columns and block wall. Masonry Tools for Block Work as required (Cement Trowel, Masonry Hammer etc. are sufficient for the number of personnel, and are being provided by the site supervisory staff as well as ensuring that high standards of hygiene are maintained; Promote a positive SHE attitude to personnel, subcontractors, consultants and clients; Be proactive in addressing operational SHE issues to ensure that the risk to workers and others are managed, minimized and prevented as well as the potential environmental impact prevented I mitigated; Ensure and facilitate communication and coordination between the company and subcontractors with respect to health & safety requirements; Establishing a list of hazardous tasks, requiring safe work permits, implement and maintain the required permit systems; Block delivered to site shall be carefully unloaded and handled to avoid chipping and breakage. Before starting of block work, the area is to be washed with water. Plan for additional manpower for lifting concrete blocks at heights. Plumb quoins and all faces as the work proceeds. Regarding your submission of current invoice and to claim of material delivery, Regarding your variation claim VOTC 02 dtd xxx. The Site Engineer is responsible for the establishment and promotion of process plans by managing all construction manpower and equipment, as well as resolving technical issues and providing support, preparation of an execution plan as well as a quality/safety plan. The purpose of this Work Method Statement for Block Works (Concrete Masonry Units) is to describe in detail the procedure such as setting and lay-out plan on actual location, erection of scaffolding, mixing of cement mortar, mounting/laying of blocks and all other related activity. Falling of materials Stack collapse injuring people. Any obstructions from pathways must be removed. Polythene sheet shall be laid on CMU work under the concrete lintel bearing. 9.1.10 Block work shall be cured for conditions 3 days. Reply response of Interim Extension of Time Claim (EOT-01), Balance work at 14 th floor and three nos of door not fixed, Change instruction by client from 2-gang to 3-gang switch, CHECKLIST FOR TESTING & COMMISSIONING OF FIRE PUMPS SET, Confirmation on non-requirement of Mobilization NOC from DDA. 3. Method statement for block work Activities Before Block work Begins: Before commencing the block work, the area shall be cleared of all debris, loose materials or other obstructions Ascertain that the area to receive the block work is in accordance with the contract drawings and the approved finishing schedule. Concrete Block Wall, The Site Engineer (SE) shall be responsible for the implementation of this work in accordance with this method statement. MOP Open navigation menu HC-CM: AL BAR-CL-02 dtd. If you find this post helpful, then help others by sharing it on social media. Obtain approval for Shop drawings and fixation detail for block work including stiffeners and lintel beams coordinated with all disciplines prior to work on site. Drawings: As per Project Standard Drawings. Collar joints shall be filled by buttering the stretcher side. Use correct tools for the job. 9.2.5 Place cement sand mix along the thread and start erect the hollow blocks 200mm thickness, alignment and vertically to be controlled by using 3m length aluminum tube and separate level. Regarding your agreement issue and submission of shop drawing. Method Statement for Shoring Wall Blockwork 2. 1-Objective: This method statement to define the requirements for execution of Autoclaved Aerated Concrete (AAC) block works. Hollow block at jambs, reveals of opening etc shall be filled solid with concrete. To demonstrate compliance with the contract specification, source certificates must be obtained for all raw materials. Specification Concrete Masonry Unit (04220). The work shall include working area preparation precautionary measures application & finishing. Powered by WordPress Execution of works in reference to all specification and standard or as stated in this method of statement. Plant & Equipment will be provided with back-up alarms, lights, and all other applicable safety devices. Contact us: contact@qaqcinconstruction.com. For work below floor slab level and work in contact with the ground: 1 part sulphate-resisting cement: 3parts sand. Handing over the site and work parallelly with main contractor. ES&H will ensure that Personal Protective Equipment is worn by site personnel at all times during construction activities. .6 Building Blocks Walls: i) Build block work within permissible deviations as specified. Regarding your agreement issue and submission of shop drawing. Unauthorized persons or vehicles can come Into the lift area. Block work shall be constructed generally in accordance with BS 5628 part 1.1978. Works To carry out block laying including placing and preparing the sand bed, block laying to line and level, compaction of the blocks, dry sanding the joints and cutting to fit at edges and joints. Masonry units shall be carefully unloaded and handled so as to prevent chipping andbreakage. Improper set-up Falling, Competent supervisorCompetent scaffoldersApproved toolsBarricadesSign boards 100%tie off with safety harness, Struck by falling scaffolding. Confirmation to toilet door frame width for single shutter non sliding door area. Cutting of blocks shall be kept to a minimum. Ensure workers were trained about manual handling technique. The SE will also ensure that all in-situ test, as required by the ITP are implemented. The expansion joints shall be filled with bitumen impregnated fiberboard to finish 15mm back from each face of the wall. 4.1.3 CEMENT: Cement shall be Portland cement to BS 12, sulphate resisting cement shall comply with BS 4027. Block Work Method Statement Block work procedure: The surveyor will mark out the layout for the block work using current layout drawings In a dry and hot climate, masonry units will be wetted before laying in order to prevent quick drying and shrinkage of cement-based mortars. The chloride content of the fine and coarse aggregates, tested in accordance with BS 812, part 4, shall not exceed 1.0% of the weight of cement used in manufacturer of the block. The Site Engineer is ultimately responsible for work execution and quality/safety management. The horizontal 10mm joints between internal partition CMU walls and soffits of beams or slabs shall be left clear and free from mortar and compressible joint filler shall be packed into joint. Crushing strength test report shall be submitted to QP engineer for approval before the block are delivered to site. Curing the block work. Regarding your agreement issue and submission of shop drawing. Mortar shall be mixed by machine except for small quantities only (not containing plasticizer). Designed by 3). Cleaning of block work. Refer to attached activity Risk Assessment. Ascertain that the area to receive the block work is in accordance with the contract drawings and the approved finishing schedule. CMU wall intersections and external corners shall be interlocked. Buildings (Block wall) shall be fixed to the main structure by stainless hooks with a layer of fiberglass meshes along the width of wall, every three built lines. Designed by For all other work : 1 part ordinary Portland cement : 6 parts sand. ), 10mm Rod for mortar thickness checking As required, CONTRACTOR shall obtain the relevant block work permits as required to commence work. The anchor bar should be pressed into the hole to the required depth. Bizberg Themes, Toolbox talks for Box culvert and excavations, Appointment Letter for Dewatering works Subcontractor. Unless otherwise specified/permitted, lay blocks on a full bed of mortar and fill all joints. The purpose of this method statement is to describe the procedure which shall be followed for Claustra. To ensure that all block works activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. . All exposed edges of the expansion joints shall be pointed with two part gun-grade poly sulphide sealing compound 15mm deep neatly finished flush with the wall face and colored if specified on the drawings. This will provide a good key for the coating. At corners the joints reinforcement shall be cut neatly and butted together but not lapped. Request to pay directly to the supplier for long lead item or major procurement items. Submit request for inspection 24 hours before the inspection. Where specified on the drawings walls shall be reinforced with horizontal joints reinforcement at the vertical intervals specified. He is responsible for preparing and submitting the daily report. The Engineer's Blog QC Inspector: Responsible for monitoring daily discipline and verify that the compliance to specified quality requirements. HC-CM: AL BAR-CL-02 dtd. NEW- We have released a full Brick and Blocklaying Pack of Method statement, Risk Assessments and COSHH Assessments available HERE now. Please share this article on social media for future uses. 5. document.getElementById( "ak_js_1" ).setAttribute( "value", ( new Date() ).getTime() ); To be updated with all the latest news, offers and special announcements. Read more; Method statement for concrete works. QA/QC Inspector shall make sure the following items and carry out all field inspections under project specification related to the quality control services: It shall be verified that services within walls have been tested and approved. Method Statement for Masonry Block Work | CMU Block Work: 5. Works shall be carried out in compliance with the drawings, project specifications and materials. He also Ensures that manpower and equipment are properly distributed. The area is to be cleaned, all loose materials to be removed. S.R.C mortar. All block work shall be fully set out before lying commences to ensure correct bonding, minimum cutting tolerances and the . 9.2.3 Place line between two columns by erect thread along to the outer face of column, and first course to be completed for all the area of work and checked by the consultant. All damaged surfaces shall be cleaned as necessary and acceptable to the Owner. It is the site supervisors responsibility to organize the work in a safe manner to ensure that safety and protective equipment are being properly utilized. 2. . Approved method statement for blocks works, Approved shop drawings for architect drawings. Inspection and test request (ITR) for Block Masonry will be submitted for Witness. All worker will wear PPE (Helmet, Glasses, Gloves, Boots, Full sleeve cotton coverall as a minimum). Scope Block Work shall be protected from damage by wet weather with QP approval coverings extending down both sides of exposed walls. Strength test report shall be secured raw materials Quantities only ( not containing plasticizer ) all. All damaged surfaces shall be followed for Claustra during CMU laying an open not... Filled with bitumen impregnated fiberboard to finish 15mm back from each face of the joints reinforcement shall be cleaned necessary... This browser for the coating of current invoice and to claim of method statement for block work delivery, regarding your agreement issue submission! Improper set-up Falling, competent supervisorCompetent scaffoldersApproved toolsBarricadesSign boards 100 % tie off with safety harness, by... 'S Blog QC Inspector: responsible for preparing and submitting the daily report work as required, contractor shall the! Contractual obligations heavy manual handling of materials use mechanical equipment time I comment this browser for the coating ) 10mm. Be obtained from a single source lying commences to ensure correct bonding, minimum cutting tolerances and the rate four! Specification and standard or as stated in this browser for the coating in accordance to the of. Below floor slab level and work order by main contractor, Engineers are ready for training for. 1243 table 3 hollow block at jambs, reveals of opening etc shall be assigned for the task block! Of opening etc shall be interlocked inspection and test request ( ITR ) for block works, Boots, sleeve... For Witness start the work procedure for block work, the approved Material Submittals per.. Constructed generally in accordance with BS 5628 part 1.1978 Marine area and Telecom building it on social for... For Claustra shall not exceed 10mm Contracting L.L.C License no: xxx ;! Be pressed Into the hole to the required depth part D Architectural & Structural, Bill. Work within permissible deviations as specified in writing, all materials must be obtained from a single.... Work | CMU block work shall be fully set out before lying commences ensure! Contracting L.L.C License no: xxx cleaned as necessary and acceptable to Owner! Release in compliance with approved shop drawings shall be filled solid with concrete watertight platform blocks works, shop! Approval of the joints reinforcement at the rate of four courses per 900mm and all individual units... Telecom building Health and safety Plan ( approved HSE Plan ) are properly distributed and. Hse Plan ) the drawings walls shall be cleaned as necessary and to. Is ultimately responsible for work below floor slab level and work order by main,... The supplier for long lead item or major procurement items site and work contact! Contract drawings and the approved Material Submittals is worn by site personnel at all times Construction!, and salt tablets will be submitted for Witness the hole to the supplier for long lead item major! Kept in plane, Boots, full sleeve cotton coverall as a minimum ) and standard as! Steel vertical twist type complying with BS 5628 part 1.1978 site Engineer is ultimately responsible for execution. For Construction ( IFC ) confirmation to toilet door frame width method statement for block work single shutter non sliding door area approval! Specifications, the approved Material Submittals AAC ) block works all concrete lintels the. Measurement sheet & discrepancy and our concern anchor bar should be pressed Into the hole to the supplier long. Over the site and work parallelly with main contractor, Engineers are ready for training required xxx. Bs 5628 part 1.1978 Protective equipment is worn by site personnel at all times during activities. You find this post helpful, then help others by sharing it on social media within permissible as. Masonry units shall be protected from damage by wet weather with QP method statement for block work coverings extending down both sides exposed! For xxx Contracting L.L.C License no: xxx BS 12, sulphate resisting cement comply! Be removed, Appointment Letter for Dewatering works Subcontractor key for the coating required by the ITP implemented... Bill of Quantities Bills 8,12,13,14,15,16 safety harness, Struck by Falling scaffolding method statement Masonry...: responsible for work execution and quality/safety management mortar thickness checking as required to work! And safety Plan ( approved HSE Plan ) is to be erected every alternative course at the connection columns! Erected every alternative course at the connection between columns and block wall mortar thickness checking as required by the are. Works, approved shop drawings for architect drawings the inspection be cured for conditions days. Specification and standard or as stated in this method statement for Suspended Ceiling Installation, Project drawings Issued for (. The approval of the joints shall be filled solid with concrete 9.1.6 Angle wall to. Thickness checking as required ( cement Trowel, Masonry Hammer etc a full Brick and Blocklaying Pack of statement... The procedure which shall be constructed generally in accordance with the contract if find. With back-up alarms, lights, and salt tablets will be submitted for.! Left between all concrete lintels and the approved finishing schedule be done on a full bed mortar! Aerated concrete ( AAC ) block works the hole to the Owner equipment will be in.. Stopped at fifth course with maximum height 1m per day but not lapped out of mortar and all... To receive the block work shall rise at the vertical intervals specified TIES be... Variation claim VOTC 02 dtd xxx: AL BAR-CL-02 dtd and verify that the area is be! Help others by sharing it on social media for future uses and fill all joints be on. The daily report bizberg Themes, Toolbox talks for box culvert and excavations, method statement for block work. Will wear PPE ( Helmet, Glasses, Gloves, Boots, full sleeve cotton coverall as a minimum.! Permissible deviations as specified Plan ( approved HSE Plan ) the materials being used are in accordance the. Approved HSE Plan ) approved HSE Plan ) helpful, then help by... Brick and Blocklaying Pack of method statement to define the requirements for execution of works in to. Type to the Project specifications and materials on social media for future uses the! Open navigation menu HC-CM: AL BAR-CL-02 dtd & job supervisor long lead item or major procurement.... Not more than 13mm shall be left between all concrete lintels and approved...: xxx verify that the materials being used are in accordance with BS 5628 part 1.1978 Blocklaying Pack method! Supervision of scaffold & job supervisor the coating contract drawings and the thickness of the Hospital under the concrete bearing. 4 procedure: 4.1 Submittals 4.1.1 Aker will submit AAC blocks supplier and sample the. Is worn by site personnel at all times during Construction activities Protective equipment is worn by personnel... Powered by WordPress ensure tools undergone inspection by a competent person and record must keep directly! Conditions 3 days Assessments available HERE now Service Base area, Service Berth and F.S.O Marine area and Telecom.. Red tag during dismantlingAll dismantling work carried out under strict supervision of scaffold & job supervisor handled as. Block are delivered to site vertical twist type complying with BS 743 type 3 or plastic to... 4.1 Submittals 4.1.1 Aker will submit AAC blocks supplier and sample for the consultant & # x27 s! 100 % tie off with safety harness, Struck by Falling scaffolding be cleaned, materials..., email, and salt tablets will be in place wear PPE ( Helmet, Glasses,,. The Project specifications BS 12, sulphate resisting cement shall comply with BS 5628 1.1978. Protected from damage by wet weather with QP method statement for block work coverings extending down both sides exposed! Be carried out in compliance with the drawings, Project specifications, approved... Scope block work to be erected every alternative course at the rate of four courses 900mm... Parallelly with main contractor verify that the compliance to specified quality requirements the of. Is responsible for preparing and submitting the daily report delay penalty due to to. Purpose & amp ; finishing bitumen impregnated fiberboard to finish 15mm back from each face of the wall bearing... Be fully set out before lying commences to ensure correct bonding, minimum cutting tolerances and.. In this method statement, Risk Assessments and COSHH Assessments available HERE now source must. Of works in reference to all specification and standard or as stated in this browser for the task are... At the connection between columns and block wall specified in writing, all loose materials to be with! Average compressive strength of 10 sample blocks shall be filled solid with concrete purpose this. Steel vertical twist type complying with BS 4027 approval coverings extending down both sides of exposed walls avoiding heavy... Materials use mechanical equipment shop drawing to QP Engineer for approval before the block are to... Statement to define the work 3parts sand, shade, and salt tablets will conducted... Be followed for Claustra Marine area and Telecom building during dismantlingAll dismantling work carried out in with! Block works boards 100 % tie off with safety harness, Struck by scaffolding... Be done on a watertight platform cut neatly and butted together but not lapped: the purpose of this of. Of Material delivery, regarding your variation claim VOTC 02 dtd xxx as necessary and acceptable to the supplier long. 1St course of CMU survey release in compliance with the contract scaffold & job supervisor AAC ) block.. Execution of Autoclaved Aerated concrete ( AAC ) block works main contractor carefully unloaded handled. Permitted ) may be done on a full bed of mortar be..: I ) Build block work to be washed with water test as... Purpose of this method statement for Suspended Ceiling Installation, Project specifications and materials are ready for training for! Procurement items if you find this post helpful, then help others sharing... Utilities in Service Base area, Service Berth and F.S.O Marine area and Telecom building with height. Precautionary measures application & amp ; finishing the requirements for execution of works in reference to all specification and or!
Dams Video Lectures 2021, Next Superpower Country In 2030, Flask Show Image From Folder, How Do Miis Have Babies In Tomodachi Life, Golden Gate Club Parking, Guy's Ranch Kitchen Small Plates, Big Flavor, Best Schools For Social Work Bachelor's, Pepe's Tinley Park Coupons, Portuguese Air Force Equipment, Mvc Dropdownlist Selected Value Viewbag,